The Ultra High Pressure MicroUnion Assembly comes completely assembled. After some repeated use, the ferrules included as part of the assembly may need to be replaced for continued optimal performance. See diagram below for proper assembly.
Please Note: Hold the tubing flush to the bottom of the port while tightening assembly